Socket Spigot Tees with Socket Branch
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-12-15 19:35
- Browse the number:
169
Company Profile
- Qingdao Nancy Metal & Machinery Co. Ltd
-
Contact:
nancymetal(Ms.)
-
Email:
-
Telephone:
-
Area:
Beijing
-
Address:
No. 138 Dunhua Road, 1303, Eurasian Center,Shibeiqu,Dingdao,, Shandong,China, Qingdao, Shandong, China (266034)
- Website: http://nancymetal.jun2057.com/

Product details
Model Number: NMM-XX-037-#9313
Brand Name: NMM or OEM
Key Specifications/Special Features:
Materials:1)Body:Ductile iron grade500-7/450-12inaccordancewithISO10832)Gasket:RubberEPDM inaccordancewithEN681.1Technical data1)Working pressure:PN10, PN16, PN25,PN402)Fluid temperature:0-50°C, excludingfrost
3)DimensionsandtestinginaccordancewithISO 2531/EN545
Surfacetreatment:
External coatings:
1)Zinccoating+bitumenpainting
2)Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Internal coatings:
1)Cementmortarlining
2) Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Note:
1)Push-in joint can assembled by pushing the spigot through the gasket in the socket of the mating component, and permits significant angular deflection both during and after installation and which can accept a light offset of the centreline
3)DimensionsandtestinginaccordancewithISO 2531/EN545
Surfacetreatment:
External coatings:
1)Zinccoating+bitumenpainting
2)Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Internal coatings:
1)Cementmortarlining
2) Liquidepoxypainting
3)EpoxyappliedbyFBE
4)Accordingtocustomers'requirements
Note:
1)Push-in joint can assembled by pushing the spigot through the gasket in the socket of the mating component, and permits significant angular deflection both during and after installation and which can accept a light offset of the centreline
Shipping Information:
- FOB Port: China (Mainland)
- Lead Time: 10 - 60 days
Main Export Markets:
- Asia
- Australasia
- Mid East/Africa
- Western Europe
New Products
-
RGB COB Strip
price: Negotiable
-
RGBW COB Strip
price: Negotiable
-
Cut-free COB LED Strips
price: Negotiable
-
Dual Color COB Strip
price: Negotiable
-
Single Color COB Strip
price: Negotiable
-
21W Cotton Non-stretch Corduroy
price: Negotiable